Contract Award Notice
Project Name: Climate Resilient Infrastructure Project
Country: Belize
Project Number: 8416-BZ
Bid Reference No: BZ-SIF-82586-CS-QCBS Contract No.: CRIP/SER/036
Method of Selection: Quality- and Cost-Based Selection (QCBS)
Duration of Contract: 7 months
Contract Signature Date: 25 April 2019
Evaluation Currency: Belize Dollars
Scope of Contract: | Consultancy to provide detailed design services for the rehabilitation of Vista Del Mar Junction and Miles 8.5 to 24.5 of the Philip Goldson Highway, Belize District, Belize | Minimum Qualifying Technical Score: | 80 |
Consultants’ names | M&K Ingenieria Civil | Politecnica Ingegneria ed Architettura | BECA in sub-consultancy associations with Youngs Engineering Consulting Ltd | IMC Worldwide Ltd. in sub-consultancy associations with Chia’s Engineering Co Ltd and FDL Consult Inc. | TYPSA Consulting Engineers & Architects |
City/Country | Murcia/Spain | Modena/Italy | Auckland/New Zealand | Redhill/United Kingdom | Madrid/Spain |
Status: | The contract negotiations failed | Awarded Consultant/ Firm | Evaluated Consultant /Firm | Rejected Consultant The financial proposal was not evaluated the minimum qualifying technical score at 80 points was not achieved |
Rejected Consultant The financial proposal was not evaluated the minimum qualifying technical score at 80 points was not achieved |
Technical Score | 80.18 | 83.10 | 82.99 | 75.48 | 63.23 |
Financial Score | 100.00 | 51.58 | 26.72 | N/A | N/A |
Combined Score | 84.14 | 76.80 | 71.73 | N/A | N/A |
Criteria | |||||
Specific Experience | 4.00 | 4.55 | 4.35 | 3.95 | 3.05 |
Work Plan & Methodology | 17.16 | 17.74 | 14.79 | 15.39 | 15.47 |
Key Experts | 46.72 | 50.31 | 53.50 | 45.14 | 35.71 |
Training | 4.30 | 4.50 | 4.35 | 4.00 | 2.00 |
Local input | 8.00 | 6.00 | 6.00 | 7.00 | 7.00 |
Price as read out | US$309,462.50, excluding local taxes | US$600,000.00, excluding local taxes | US$809,056.00 and BZ$463,543.00, excluding local taxes | N/A | N/A |
Final Evaluation Price | BZD624,340.59 | BZD1,210,500.00 | BZ$2,337,038.48 | N/A | N/A |
Final Negotiated Price | N/A the contract negotiations failed |
US$712,500.00 | N/A | N/A | N/A |
Rank | 1 | 2 | 3 | N/A | N/A |
Other Shortlisted Consultant(s)/Firm(s)
Consultants’ names | Mott MacDonald in sub-consultancy associations with Nextera Environmental and Engineering Consultants |
City/Country | Southampton/ United Kingdom |
Proposal Submitted: | No |